comprise a hybrid ALLROUNDER 630 H with a clamping force of 2,500 kN, a clean air module, a Hoefer & [...] off a triple coup at the K 2016 with the ALLROUNDER 1120 H by pre- senting a new machine size, a new [...] use” manufacture of a complete watch in the ARBURG design in a single step on a turnkey sys- tem. An
also accommodate a well- stocked spare parts warehouse and a demonstration room as a forum for presenting [...] accommodate offi ces, a well-equipped spare parts store- room and a demonstration room. On a 230 square metre [...] service. A R B U R G projec t s 14 A R B U R G h is tor y MILESTONES Electro-mechanical dos- age - a milestone
enable a briefcase shell, a hinge pin, and a closing bolt to be produced within each cycle so that a complete [...] placed inside a fi lm separating station in pairs. They are piled up onto a rotary table in such a way that [...] system featured a colour monitor with a keypad and an arm that allowed it to swivel, which was a real fi rst
CIM helped us a great deal.” As a positive “side-effect” of the change from a steel to a ceramic sliding [...] sals” were held in Lossburg on an ALLROUNDER 520A and a 4-cavity mould. The necessary technical prerequisites [...] ALLROUNDER 720 A. Equipped with a 32-cavity mould, this machine produces more than 400,000 capsules a day in
injection moulding A complex turnkey system built around a hydraulic ALLROUNDER 470 S with a clamp- ing force [...] with a DMC (data matrix code) are supplied in trays. A KUKA six-axis robot takes four coils at a time [...] parts at a time are heated to around 100 degrees Celsius in a preheating furnace and placed in a heated
ALLROUNDER 470 A with a clamping force of 1,000 kN and a size 400 injection unit, equipped with a MULTILIFT [...] is based on a system solution from ARBURG comprising a hydraulic ALLROUNDER 520 S with a clamping force [...] an electric ALLROUNDER 470 A (ALLDRIVE) with a clamping force of 800 kN and a size 290 injection unit.
hot runner control, a high-performance plasticising unit and a mould featuring a pneumatic needle shut-off [...] achieve a high material throughput in a very short cycle time, this exhibit is also equipped with a high [...] has been cut by a third through the use of a geo- thermal heating system. In 2008, a new power plant
can you be a bike rider, an Indian, a Western hero, a pilot, a knight, an adven- turer, a train driver [...] K O N RBURG A R B U R G a r c h i t e c t u r e 4 Investing in the future ARBURG II – A project that [...] the dawning of a new age This project is much more than a new hall or extension. It is a com- pletely new
millennium. A spe- cial date for the whole world of plastics. The K is always regarded as a very special [...] community in Ger- many, a very well-organised and detailed plastics museum – a tip – for visitors, the [...] is almost there. The 720 S with a clam- ping force of 3200 kN and a maxi- mum shot capacity of 1300 gPS
offer and in- corporates both a handling system and a conveyor belt in a compact design beneath the enlarged [...] such as a mechanical intermediate stop on the pneumat- ic Z-axis, a pneumatic X-axis or a servo-electric [...] small parts, had within a very short time created a furore and given the company a considerable reputation