Automatically-functioning two-component injection moulds comprise two stations: In the first process step, a pre-moulded part is initially created in a cavity, and then transferred to a second working position. For this step, the mould is opened, and the necessary change in position is completed by a rotary motion of 180°. After the mould is closed, the pre-moulded part is located in the second position for final injection with the second component. Simultaneous to this second step, the next pre-moulded part is already being created in the first mould cavity. During the next opening of the mould, the mould cavities are turned back by an alternating rotary motion. The finished part is now demoulded from the second cavity, while a new pre-moulded part is placed into position from the first cavity.
|